CLC releases Site Operating Procedures v6
Contents |
[edit] Overview
The CLC Site Operating Procedures (SOP) have been updated. Changes include:
- Key precautionary measures such as social distancing are now located on page 1.
- Updated guidance on shielding, self-isolation, testing and what to do if a worker develops COVID-19 symptoms or must self-isolate.
- A confirmation that canteens serving food must display an NHS QR Code.
- Addition of the recent CLC statement on the use of face coverings.
[edit] Face coverings
Where workers on site are not required to wear Respiratory Protective Equipment and their workplace (which may include welfare and changing facilities, site offices or site meeting rooms) meets all three of the criteria (shown below), their employer should make face coverings available - and they should be worn:
- An enclosed space;
- Where social distancing isn’t always possible; and
- Where they come into contact with others they do not normally meet.
In line with Government guidance on premises providing hospitality, face coverings must be worn in canteens, except when seated at a table to eat or drink.
Version 6 of the SOP says “local COVID alert levels do not restrict construction activities; however, any additional local authority restrictions must be complied with. Note: current measures in Wales can be viewed at: https://gov.wales/coronavirus-firebreak-frequently-asked-questions
Businesses are advised to monitor information from government sources, or e.g. their trade body.
This article originally appeared on the ECA website under the headline, "New v6 Site Operating Procedures." It was published on 21 October 2020.
--ECA
[edit] Related articles on Designing Buildings Wiki
- Articles by the Electrical Contractors' Association (ECA).
- Construction Leadership Council CLC.
- Construction sites urged to integrate test and trace.
- Coronavirus and the construction industry.
- Engineering services bodies issue coronavirus site safety guides.
- Face coverings and a shifting policy background.
- Personal protective equipment PPE.
- Social distancing compliance marshal.
- Social distancing on construction sites.
- Standard operating procedure.
[edit] External resources
Featured articles and news
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.
UKCW London to tackle sector’s most pressing issues
AI and skills development, ecology and the environment, policy and planning and more.
Managing building safety risks
Across an existing residential portfolio; a client's perspective.
ECA support for Gate Safe’s Safe School Gates Campaign.
Core construction skills explained
Preparing for a career in construction.
Retrofitting for resilience with the Leicester Resilience Hub
Community-serving facilities, enhanced as support and essential services for climate-related disruptions.
Some of the articles relating to water, here to browse. Any missing?
Recognisable Gothic characters, designed to dramatically spout water away from buildings.
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.

























